Cherreads

Chapter 1057 - Chapter 634: Repair the Plank Road by Day, Secretly Cross the Wei River by Night (8000)_2

They are integrated conduits containing both Magic Channels and information channels, capable of connecting every city in the Bay Territory through the means of magic and machinery.

Subsequently, a layer of concrete will be added on top of the conduits, with specially reserved grooves for placing and installing railway tracks.

The Tyrannical Giant Engineering Machinery continuously "absorbs" the materials transported by the Golem Train, constructing them into an integrated Magic Railway.

When the Tyrannical Giant Engineering Machinery passes by, it leaves behind a Magic Railway wall that stands 3 meters above the ground.

It can prevent the burial by the sands of the Desert of Death, further reducing maintenance costs.

The Golem Train following behind the Tyrannical Giant Engineering Machinery has also completed a special modification on its "head."

It, too, has grown seven or eight Mechanical Arms, swiftly installing the transported railway tracks onto the Magic Railway.

This is the end of Part One, download Chereads app to continue:
More Chapters